Scope of Work
Architectural, structural and mechanical design of three substations: Ashrafieh, Dahieh and Bahsas, in addition to the coordination between the different trades. DEP was also , the Architect and Engineer of record for the project in charge of obtaining the permit for the three substations . Each substation has 3 x 70 MW HV transformers and ties within an urban context. The challenge was to integrate the highly demanding technical requirements within this context.
- Location: LEBANON
- Year: 2013 - 2016
- Client: Matelec (Lebanon)
More pictures of the project
KHOR AL ZUBAIR POWER PLANT TURBINE INLET AIR COOLING PLANT AND SYSTEM (TIAC) – IRAQ
MEEZA MSI SERVICE 114 ICT FACILITIES TIER 3 DATA CENTERS IN DOHA – QATAR
YEMEN 127 MW POWER PLANT
INDUSTRIAL PROCESS DESIGN SUB-CONSULTANCY AGREEMENT WITH JEDSON INC.- USA
PETRORABIGH P-II POLYMER & MONOMER LABORATORY – KSA
REHABILITATION OF PUMP STATIONS IN SOUTH LEBANON
ERBIL 33/11 KV MOBILE SUBSTATION UNITS – IRAQ
THIKA 87 MW HFO/DFO THERMAL POWER PLANT-KENYA
NDIA CENTRAL UTILITY PLANTS (CUPS) – CP60 PACKAGE – QATAR
NAJAF POWER PLANT – IRAQ