Khor al Zubair Power Station in Iraq involves two existing ALSTOM 13D gas turbines, having an 81.2MW capacity each. DEP scope was to provide a full detailed design study and shop drawings for a cooling system that would cool the inlet air to the gas turbines to increase their efficiency. This specialized technology enables the government to increase the production without interruption of the operation. The design included 3D mechanical model for the mechanical plant rooms and structural design for the steel structure for the filters and piping support. This project consists of installing two chiller plants, composed of 2 chillers each, generating a total of 7000 TR cooling water. These water cooled chillers, will provide the necessary chilled water to the “filter houses”, where the turbines inlet air will be cooled to reach a temperature of less than 15deg.C at the turbine suction side.
Scope of Work
MEP Design of the project
- Location: IRAQ
- Year: 2016
- Client: Ministry of Electricity
More pictures of the project
MEEZA MSI SERVICE 114 ICT FACILITIES TIER 3 DATA CENTERS IN DOHA – QATAR
YEMEN 127 MW POWER PLANT
INDUSTRIAL PROCESS DESIGN SUB-CONSULTANCY AGREEMENT WITH JEDSON INC.- USA
PETRORABIGH P-II POLYMER & MONOMER LABORATORY – KSA
MATELEC 220-20-11 KV SUBSTATIONS- LEBANON
REHABILITATION OF PUMP STATIONS IN SOUTH LEBANON
ERBIL 33/11 KV MOBILE SUBSTATION UNITS – IRAQ
THIKA 87 MW HFO/DFO THERMAL POWER PLANT-KENYA
NDIA CENTRAL UTILITY PLANTS (CUPS) – CP60 PACKAGE – QATAR
NAJAF POWER PLANT – IRAQ