Equipped with 5 MAN 60/48 reciprocating engines (18.7 MW each), combined cycle and steam turbine (7MW). Some important components include: Truck Weighing station, Raw water tank, Treated water tank, Fire Fighting water tanks, Condenser, Radiators, 5 Boilers, Auxiliary transformers (15kV/0.4kV) and Step-up transformers (15kV/132kV).
Scope of Work
MEP Design for the buildings
- Location: KENYA
- Year: 2011 - 2012